Institutional

Blattner Stadium

ROCORI-High-School-Blattner-Stadium-Lighting-Cold-Spring-MN
High-School-Football-Stadium-Construction-Central-Minnesota
Aerial view of completed ROCORI Blattner Stadium bleachers and athletic facility in Cold Spring MN
Grand opening of the BCI Construction designed-and-built Blattner Stadium with fans in attendance
Packed home-side bleachers and stone masonry at Blattner Stadium, built by BCI Construction.

Team

  • Design Build: BCI Construction, Inc.
  • Owner: ROCORI High School
  • Project Funder: ROCORI Booster Club
  • Architect: GLTA Architects

Project Facts

  • Cold Spring, MN
  • Completed September 2021
  • Cost: $6.67M
  • 112,000 square feet

A 10-Month Stadium Project Completed in Just 4 Months.

Start Your Institutional Project

Team Results

The ROCORI Booster Club, with the support of private donors, wanted to build a new stadium that would provide the ROCORI school district an enhanced space for football, soccer, lacrosse, track and other activities. The Booster Club wanted the stadium completed for the first home football game in September, but construction couldn’t begin until early June (after graduation took place on the existing football field). A project of this scale would typically take 9-10 months, but our team and amazing partners completed it in just four. The project included five buildings and over 52,000 square feet of concrete walkways. Every detail was carefully crafted with the intent to heighten game day experiences for everyone at the stadium.

Read more about the project and the stunning results.

BCI can help you with your commercial space.

Contact Us